City of Bettendorf, Iowa

A premier city.

Proposed Tanglefoot Lane Reconstruction, 18th Street to Greenbrier

 

FOR IMMEDIATE RELEASE:

 

August 1, 2012

 

SUBJECT: Proposed Tanglefoot Lane Reconstruction, 18th Street to Greenbrier

FURTHER INFORMATION: 563-344-4055

 

 

BETTENDORF: The City of Bettendorf, Tanglefoot Lane Project from east of the Greenbrier Drive intersection through the intersection at 18th Street will be switching traffic on August 04, 2012.  Tanglefoot Lane will still be closed to through traffic from Greenbier to 18th Street. The local traffic will be one-way eastbound from Greenbrier to Midland Hill Drive with a local traffic detour from Tanglefoot Lane to Midland Hill Drive to Echodale Street to 18th Street. Westbound Tanglefoot Lane will be closed to through traffic at Asbury Street with a detour from Westbound Tanglefoot Lane to Asbury Street to New Lexington Drive to 18th Street. Also 18th Street will still be reduced down to a lane each way. All Detour routes will be posted and signed.  

 

For more information please call 344-4055.